Skip to main content
← All guides

Hebrew Legal Terms Glossary for Israeli Real Estate | Investor's Dictionary

AI Summary Box

  • 50+ terms covering legal, financial, construction, and municipal domains
  • Format: Hebrew | Transliteration | English | Legal Context
  • Critical for: Contract review, developer negotiations, lawyer communication
  • Source: Israeli Land Law, Planning & Building Law, Sales Law (Chuk Mecher)

How to Use This Glossary

Terms are grouped by domain. Each entry includes: Hebrew script | Transliteration | English | Legal Significance. Terms marked ** are contract-critical — never sign without understanding.


1. Ownership & Registration (Tabu)

HebrewTransliterationEnglishLegal Significance
טאבוTabuLand RegistryOfficial government registry of property rights. All transactions must register here. **
נסח טאבוNesach TabuTabu ExtractOfficial ownership certificate. Always request before signing. **
רשות מקרקעי ישראלReshut Mekarka'ei YisraelIsrael Land Authority (ILA)Manages 93% of state land. Leases (not sells) via long-term contracts (49+49 years).
חכירהChachiraLeaseholdLong-term lease from ILA (typically 98 years). Functionally similar to freehold.
בעלותBa'alutFreehold OwnershipPrivate land ownership (7% of land). Full rights, no lease renewal needed. **
הערת אזהרהHe'arat AzharaWarning Note/CaveatRegistered claim on property. First buyer to register gets priority. **
משכנתאMashkantaMortgageRegistered charge on property. Bank registers He'arat Azhara then Mashkanta.

2. Purchase Process & Contracts

HebrewTransliterationEnglishLegal Significance
חוק המכר (דירות)Chuk HaMecher (Dirot)Sales Law (Apartments)Primary consumer protection law. Mandates bank guarantees, payment vouchers, late-delivery penalties. **
ערבות בנקאיתArvut BankaitBank GuaranteeMandatory for every payment over 7% of price. Issued by project's accompanying bank. **
שובר תשלוםShovar TashlumPayment VoucherOfficial bank form. Only valid payment method for off-plan purchases. Never pay directly to developer. **
בנק מלווהBank MelaveAccompanying BankBank supervising project finances. Issues guarantees, controls construction account.
זכרון דבריםZichron DevarimMemorandum of UnderstandingBinding preliminary agreement. Can constitute full contract if detailed. Avoid signing without lawyer. **
ייפוי כוחYipui KoachPower of AttorneyAllows remote signing. Must be notarized + apostilled/consularized for foreign signatories. **
מס רכישהMas RechishaPurchase TaxProgressive tax on buyer. Non-residents: 8-10%. Olim: 0.5-8%. Paid within 50 days. **
מס שבחMas ShevachCapital Gains TaxOn seller. 25% on real gain (non-residents). Exemptions for primary residence, Olim.

3. Construction & Delivery

HebrewTransliterationEnglishLegal Significance
היתר בנייהHeter BniyaBuilding PermitMandatory before construction. Verify exists and matches sales brochure. **
טופס 4Tofes 4Occupancy Permit (Form 4)Legal completion certificate. Building connected to utilities, safe for habitation. Keys only after Tofes 4. **
טופס 5Tofes 5Completion CertificateFinal certificate after all common areas finished. Triggers final payment.
תקופת בדקTkufat BedekDefect Liability PeriodStatutory warranty periods: 1-7 years depending on element. Developer must fix. **
בדק ביתBedek BayitPre-Handover InspectionProfessional engineer inspection before taking possession. Do not skip. **
מ"מד / ממ"דMamad / MemadProtected Space (Bomb Shelter)Mandatory in all new apartments since 1992. Minimum 9m², blast-resistant.
מעלית שבתMa'alit ShabbatShabbat ElevatorStops automatically on every floor Friday sunset to Saturday night. Standard in religious areas.
הצמדה למדדHatzmada LaMadadIndexation ClauseUnpaid balance linked to Madad Tsumot HaBniya (Construction Cost Index). Negotiable cap. **
מדד תשומות הבנייהMadad Tsumot HaBniyaConstruction Inputs IndexMonthly CBS index (concrete, steel, labor). Drives price escalation on unpaid balance.

4. Planning & Zoning

HebrewTransliterationEnglishLegal Significance
תב"עTabaLocal Master PlanZoning plan: permitted uses, building rights, height limits. Check before buying.
תמא 38Tama 38National Outline Plan 38Earthquake strengthening. Tama 38/1 = reinforce existing. Tama 38/2 = demolish & rebuild.
פינוי בינויPinui BinuiEvacuation-ReconstructionUrban renewal: entire complex demolished, rebuilt at higher density.
שינוי ייעודShinui Ya'udChange of DesignationConverting land use (e.g., agricultural → residential). Complex, uncertain.
אחוזי בנייהAchuzay BniyaBuilding Rights (%/FAR)Floor Area Ratio. Determines max buildable area. Key value driver.
הקלהHakalaVariance/RelaxationPermission to deviate from Taba (e.g., extra floors). Requires public hearing.
התנגדותHitnagdutObjectionPublic right to oppose planning decisions. Can delay projects years.

5. Financial & Tax

HebrewTransliterationEnglishLegal Significance
מס רכישהMas RechishaPurchase TaxSee Section 2. Progressive brackets. File Form 7000 within 50 days.
מס שבחMas ShevachBetterment/Capital Gains TaxSee Section 2. 25% on real gain. Many exemptions.
היטל השבחהHitel HashbachaBetterment LevyMunicipal tax on value increase from upzoning/approvals. Seller usually pays.
ארנונהArnonaMunicipal Property TaxAnnual tax based on size, location, use. Owner pays (not tenant).
ועד ביתVa'ad BayitBuilding Committee / HOAMonthly maintenance fee. Mandatory. Covers cleaning, elevator, insurance, reserves.
קרן חידושKeren ChidushRenewal FundMandatory reserve for major repairs (roof, facade, elevators). Part of Va'ad Bayit.
מע"מMa'amVAT (17%)Applies on new apartments from developer. Included in quoted price usually.

6. Professional Roles

HebrewTransliterationEnglishLegal Significance
עורך דין מקרקעיןOrech Din MikrakeiReal Estate LawyerYour lawyer ≠ Developer's lawyer. Mandatory for foreign buyers. **
שמאי מקרקעיןShamai MikrakeiLicensed AppraiserBank requires for mortgage. Also for tax assessments, disputes.
מהנדס בנייןMehandes BniyaStructural EngineerConducts Bedek Bayit. Must be licensed (Reshum).
מתווךMetoachReal Estate Agent2% + VAT standard commission. Must hold license (Reshum Metoachim).
נוטריוןNotaryonNotaryCertifies translations, powers of attorney, document authenticity.

7. Common Contract Clauses (What to Watch)

Hebrew PhraseTransliterationMeaningRed Flag If...
ללא ערבות בנקאיתLe'lo Arvut BankaitWithout bank guaranteeILLEGAL for off-plan. Walk away.
תשלום ישיר לקבלןTashlum Yashir LaKablanDirect payment to contractorILLEGAL under Chuk Mecher. Never do this.
הצמדה מלאה למדדHatzmada Mle'a LaMadadFull indexationNegotiate cap (e.g., max 2%/year or fixed after X%).
איחור במסירה עד 90 יוםIchor BeMasira Ad 90 YomDelivery delay up to 90 daysStandard grace. Beyond = statutory penalties apply.
פיצוי מוסכםPitzuy MuscamAgreed damagesMust be reasonable pre-estimate. Penalty clauses unenforceable.
ויתור על טענותVitur Al TaanotWaiver of claimsNever sign blanket waiver before Bedek Bayit.

Quick Reference: The 10 Terms You MUST Know Before Signing

  1. Tabu — Where ownership lives
  2. Chuk Mecher — Your legal shield
  3. Arvut Bankait — Your money's bodyguard
  4. Shovar Tashlum — The ONLY way to pay
  5. Tofes 4 — When you actually get keys
  6. Tkufat Bedek — Your warranty clock
  7. Mamad — Non-negotiable safety feature
  8. Madad Tsumot — The inflation ghost in your contract
  9. Hitel Hashbacha — The surprise municipal bill
  10. Yipui Koach — Your remote-control pen
  11. Orech Din — The only person on your side

Internal Links

FAQ Schema

Q: What is the most important Hebrew term for a foreign buyer? A: Chuk Mecher (חוק המכר) — the Sales Law that mandates bank guarantees and protects off-plan buyers.

Q: What does "Shovar Tashlum" mean and why does it matter? A: Payment Voucher. It's the only legal way to pay a developer for off-plan property. Paying directly to the contractor is illegal and unprotected.

Q: What is "Madad Tsumot HaBniya" and should I worry? A: Construction Costs Index. Your unpaid balance is linked to it. Negotiate a cap (e.g., max 1.5%/year or fixed after 24 months).

Q: Do I need a Notary for Power of Attorney from abroad? A: Yes. Notarized + Apostille (or consular legalization) required for Israeli acceptance.

Q: What is "Tkufat Bedek" and how long is it? A: Statutory defect liability period. 1 year for most items, 3 years for plumbing/electric, 7 years for structural/façade/waterproofing.